This report covers the period from Feb 2 2006 to Feb 16 2006 (two weeks).

Highlights

  • Chandler Design has included serious progress on Dashboard, sections, free-busy planning and more.
  • Cosmo 0.3 release plan firmed up: probably release March 1 or after but with more testing than ever.
  • Scooby 0.1 will ship in tandem with Cosmo as Scooby feature work is finishing up just now.

Design and PM (Sheila)

Progress:

Plans:

Application WG (Philippe)

  • Progress :
    • Tons of progress on the Design front.
    • Decisions on Dashboard sections implementation and Collections
    • 0.7 bug triage complete, Prioritization ditto, SWAG under way
    • 0.7 bugs started to be fixed. Early prototyping and ideas for Dashboard.
    • 0.7 Components identified and assigned to owners
    • 0.6.1 shipped!
  • Plan :
    • Continue progress on 0.7 tasks and design
    • Log 0.7 tasks for Phase 1 of Dashboard and Scheduling at least
    • Finish SWAG 0.7 bugs

Platform WG (Katie)

Progress:

  • Prepping for PyCon presentations
  • Some refactoring for proper layering (FrameworkModularity)
  • Got Chandler running on proposed new way of dealing with floating events.
  • Actively working on interop calendar bugs
  • Actively working on eggs and setuptools
  • Actively working on auto-sync for sharing, including work on merging and sharing tests
  • Discussions about schema evolution (Keeping Users' Data thread on dev list)
  • Removed libxml2 from build (zanshin, sharing layers use elementtree instead)
  • Collected domain model issues for 0.7
Plan:
  • Release setuptools 0.6a10
  • Bugzilla components proposal
  • Bottom up plan for 0.7, schedule work to alpha milestones, start spec writing
  • PyCon

QA, Build and Release (Heikki/Aparna)

Progress:

  • Rework of CATS.
  • Debugging functional test runs on tinderbox

Plans:

  • Cosmo test plan for 0.3
  • Cosmo test automation plan for 0.3

Cosmo and Scooby (Lisa/Bobby)

Progress:

  • Cosmo 0.3 P1/P2 bug list down to 8 bugs, but a couple of them are several-days-work each.
  • Rough deployment plan is to test Cosmo 0.3 first as part of scooby-demo, and do integration testing with Chandler sharing, before upgrading cosmo-demo sometime later.
  • Scooby 0.1 release work ongoing,
  • Roughly defined goals for Scooby landing page, now filling in requirements and fleshing out goals.
  • Scooby now talks to Cosmo!

Plans:

  • Cosmo 0.3 bug fixes
  • BKirsch to PyCon
  • Scooby QA ramping up.
  • Cosmo 0.3 CalDAV/REPORT test cases (Heikki, with BCM and Bobby)

IT (Jared)

Progress:

  • Retrospect backups are in beta testing
  • Bugzilla email integration work ongoing.
Plans:
  • Security work.

Community (Pieter/Ted)

Progress:

  • Working on drafts for web landing pages for both the Cosmo and Scooby projects.
  • Talked to Deb Richardson at Mozilla regarding portal project
  • Drafts of committer policy
  • List of projects for OSU and other external folks TedLeung2006012?

Plans:

  • Have landing pages for both Cosmo and Scooby ready for the joint release 1st week in March
  • Public discussion of committer policy
  • Get Portal use cases brainstorm moving
Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r8 < r7 < r6 < r5 < r4 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.